PURPOSE-BUILT-LIFTING-PLATFORM
Thursday 27 November 2008In an attempt to reduce the amount of unnecessary water waste, Northparkes copper mine joined with Nylex to produce a product that would efficiently reduce water evaporation from large open water storage facilities.
Tuesday 18 November 2008Domain Domes has launched a range of versatile, re-locatable or permanent shelter systems.
Monday 17 November 2008Aloca is a finalist in the 5th Annual Prospect Awards for designing a bearing lifting jig that removes the hazards that come with unsecured loads.
Tuesday 11 November 2008Tenova-SEMF has added four purpose built radial stackers to its range.
Thursday 21 August 2008The NSW Department of Primary Industries (DPI) has released a safety alert urging all mines to maintain their elevated work platforms after two workers were injured during routine maintenance work on an underground coal mine.
Wednesday 11 June 2008Enerpac launched a PLC controlled synchronous lifting system in Australia to maximise safety and precision during the maintenance of a huge dredger at the largest coal mine in the Southern Hemisphere.
Wednesday 04 June 2008Team Systems has launched a folding safety cage which is designed to accept the forks of a fork lift truck.
Monday 07 April 2008ADFORM Products have released the maxiskaff system which custom designs and builds safety platforms.
Thursday 03 April 2008An initiative developed by Worsley Alumina employees has revolutionised the way maintenance is carried out on the 52km overland conveyor used to transport bauxite from the Boddington mine to the refinery, near Collie.
Thursday 18 October 2007AN UPGRADED electric scissor lift range is available with 76 cm chassis width, and a platform capacity of 450 kg.