Australian Mining - Australia's premier mining news website

News

Wednesday 17 October 2007

Geraldton Port capacity to increase

THE Geraldton Port’s iron ore export capability is set to increase substantially with the arrival of a new high-capacity iron ore shiploader.

According to the Government, the Berth 5 project will enable the port to process at least 12 million tonnes of iron ore per annum - a great advance on the 3.5 million tonnes of iron ore per annum currently being exported through Geraldton.

On-site construction works began in February this year.

The new facility is designed to load iron ore at a rate of up to 5,000 tonnes per hour, enabling the typical iron ore vessel to arrive, load and sail within a 24-hour period.

Leave a comment

Enter the code shown:

Newsletter sign up

Sign up to receive the latest breaking news

News barometer

Industry Outlook Do you feel optimistic, neutral or pessimistic about the future of the Australian minerals industry over the next twelve months?
 
85%
 
12%
 
3%